IV-11 VFD Tube Clock

IV-11 VFD Tube Clock

Documentation & support for the IV-11 VFD Tube Clock

Back to Products

Step-by-step Assembly VIDEO Guide

How to Troubleshoot

During Soldering/Assembly

  • Follow the soldering tutorial video or Assembly Instruction closely.
  • Do NOT skip steps.
  • Test the voltages as directed. If they are incorrect, stop and figure out the problem. Do not proceed until the voltages test okay.

STEP-BY-STEP TROUBLESHOOTING

If it's not working after assembly:

  • Check all IC's to make sure 1) they are at the correct location; 2) they are in correct direction
  • Check diodes to make sure their polarity is correct.

Measure TP1 and TP2

  • TP1 should be around 1.3V, and TP2 should be around 26V. If not, something is wrong with your power supply portion.